Instale o Flash Player mais recente
Portuguese Language English Language Spanish Language
Home  > Water > Main Infrastructures > Beliche Water Treatment Plant 
Visitas
Beliche Water Treatment Plant

Beliche Water Treatment Plant

ETA BelicheThe Beliche Water Treatment Plant, located beside the dam with the same name, has a capacity of 13,000 m3/day. Covering the counties of Castro Marim and Vila Real de Santo António, the Beliche Water Treatment Plant serves a maximum of 60,000 inhabitants.

ETA Beliche Sala Telegestão The BELICHE Water Treatment Plant forms a part of the Algarve Multi-municipal Water Supply System and is supplied by water coming from the Odeleite and Beliche lagoons. The treatment processes adopted enable excellent quality water to be obtained. The techniques used are extremely efficient for removing unwanted substances from the original water (biological, microbiological and chemical nature). This is the only way to guarantee high quality water production with excellent organoleptic characteristics.


SCHEMATIC PROFILE OF THE TREATMENT

WATER TREATMENT LINE

  1. Untreated Water Intake
  2. Ozonisation
  3. Remineralisation
  4. Coagulation
  5. Adsorption
  6. Decantation
  7. Rapid Filtration in Sand
  8. pH final adjustment
  9. Treated Water Cistern
  10. Final Disinfection with Chlorine



MUD TREATMENT LINE

  1. Dirty Water Cistern and Mud Cistern
  2. Mud Thickener
  3. Mud Dehydration (CENTRIFUGAL)

Weather
Faro, Algarve
Fair Temp N/A/19°C
Hum 57%
Wind N
19 km/h
Current 22°C
Next Few Days